In the framework of CČN Gornja Radgona several constructions have been realized:
- Connecting road
- Supporting objects on sewage
- Constructions on the plant:
- offices,
- SBR tanks,
- intake pump station,
- measuring equipment on discharge,
- transformer,
- intake of the sludge,
- meter shaft,
- landscaping.
Contracted works were conducted according to the yellow book FIDIC and included design, construction works, and testing operation.
The planned design capacity of the purifying plant Gornja Radgona is 8,800 PE. Catchment area of CČN Gornja Radgona includes residential areas of Gornja Radgona, Norički vrh, Črešnjevci, Zbigovci, Hercegovščak, Podgrad, Mele, Lomanoše and Plitvički vrh. In the areas of Gornja Radgona town there are some polluting plants, which will also be connected to CČN Gornja Radgona in the future.