Project involves the construction of 7.28 km of the highway, 25 categorized deviations and 24 non-categorized deviations, connection Lancova vas and Podlehnik, 4 overpasses, 2 pedestrian underpasses, 1 underpass, 12 bridges, 8 box pipelines, 6 structural walls, hydraulic engineering of streams, platform of the supply station Podlehnik as well as the relocation and arrangement of municipal infrastructure.