Several demanding construction works with the change of turbine have been performed on hydro-power plant KW Weinzödl near Graz. The hydro-power plant produces 63,040 MWh of electric energy annually.
Due to high maintenance costs, the owner, company Verbund, decided to change the existing turbines with new ones. The turbine supplier is the Slovenian company Litostroj power, with which we conduct carpentry and works where reinforced concrete, SCC concrete and system panels Doka are used.