Project relates to the construction of the road in length of 745 meters, realization of 5 connections in length of 137.20 m, realization of two intersections and road overpass over the single-track railway Ormož–Murska Sobota–Hodoš, construction of the underpass in the vicinity of the station, relocation and protection of municipal installations as well as canceling of the level crossing. In the areas with risk of flooding near Pušenski potok there was constructed also a dam, which will not impact the present water levels, and a pedestrian underpass.