Project relates to reconstruction of the road through Turnišče settlement.
The bed has been replaced, sub-base made and asphalt laid. The width of the new road is 6 m with a two-sided walkway and granite verges. Over the whole length of the road there is a renewed drainage and street lighting; two bus stops are also made.