Project relates to reconstruction of the road construction from km 5.300 to km 8.800 and on legs A, B, C, and D on 0136 Slovenske Konjice connection.
Road elements are summarized according to the existing highway section; the existing road surface is upgraded so that all of the remaining horizontal and vertical elements (axis, transverse slope, height) of the highway remain unchanged according to the existing road. The area to be processed is approx. 45,000 m2 of asphalt surface. For the reconstruction and upgrade of this highway section approx. 880 tons of asphalt for local restorations, approx. 10,600 tons of asphalt for local restorations, approx. 6,200 tons of asphalt mass for the upper layer have been spent.