Project relates to reconstruction of the road surface on Pesnica-Slivnica highway, which is constructed as a four lane road with two carriageways, one emergency lane in each direction and a central divide.
After finished construction- and asphalting works, the assembly of new BVO and JVO has been made on the inner and outer highway lanes along with the re-installation of the vertical traffic signalization and new realization of the horizontal signalization.