Project relates to the realization/arrangement of 8 level crossing with connecting roads, building of two underpasses, bridge, four pipelines and two structural walls, hydraulic engineering, land reclamation, relocation of municipal installations (electricity, phone, cable TV, water supply, gas supply), demolition works, realization of SVTK-equipment and rail equipment on crossing sites.