Project relates to realization/arrangement of 9 level crossing with connecting roads, building of the underpass (Murska Sobota), building of the overpass (Lipovci), building of the bridge and pipelines, hydraulic engineering, land reclamation, relocation of municipal installations (electricity, phone, cable TV, water supply, gas supply), demolition works, realization of SVTK-equipment and rail equipment on crossing sites.