Renovation under Malečnik

In the framework of the project, 780 meters of a new road section have been constructed as the whole area had to be arranged with supporting elements. As a protection from falling stones, a 210 m long gallery has been built with connection to the Malečnik bridge. Along with the renovation of the road surface and newly built gallery, new pedestrian tunnels, cycle tracks and 338 m of support constructions have been built; 651 meters of water stream from Zokova grapa have been regulated along with municipal installations and drainage. 

Other projects
Pomgrad inquiry

Do you need our services?

Send us your query and we will respond in the shortest time possible.