Project relates to sewage system, designed as a separate system for feces in a waterproof system.
Sewage system will be laid as a closed type from all the residential buildings into the biological purifying plant Melinci. Total length of primary lines is 36,667 m, from which there are 17,793 m of gravitational and 18,874 m of pressurized pipes. A new purifying plant Melinci is a mechanical-biological type with 15,000 PE.